What a part should cost, built up from first principles
PITCHING AT THE NEW YORK NIGHT ON 2 SEPTEMBER 2026
Manufacturers negotiate against supplier quotes without knowing what a part ought to cost to make. Building that number from the ground up is how enterprises find margin, and the tools that do it today are slow and inaccurate. Apex Current does the costing agentically, then watches the commodity, tariff and quality signals that move the number after the quote lands.
Cost engineering is the discipline of working out what a part should cost from its material, process and labour rather than from what a supplier asks for it. Done properly it is where large manufacturers find their margin and their negotiating position. Done with the tools that exist it is slow, needs a specialist, and produces a number accurate enough to argue about but not to rely on.
Apex Current automates the build-up and then keeps it live. A signed bid sitting below the current copper rate, a memory price moving on AI server demand, a tariff review touching two open bids: these are the events that quietly turn a good award into a bad one, and the platform surfaces them against the parts they affect. Buyers see it at the level they think at, from a single part up to total spend across a commodity.
These founders pitched at the same startup events. The room is usually the reason people find each other.